Math 4 crane removal prompts temporary closures on Tuesday

| May 11, 2026

On Tuesday, May 12 from 7 a.m. to 5 p.m., the Mathematics 4 (M4) crane will be dismantled and removed. 

A note from the department reports, “Due to the dismantling of the Tower Crane for the Math 4 project, all adjacent pedestrian pathways will need to be closed for safety.”

This closure includes pedestrian access down William Tutte Way from Ring Road to the Mathematics 3 (M3) building and front door access of M3 from the L-Lot to William Tutte Way pathway, which is located between M3 and General Service Complex (GSC).

Both M3 and GSC will remain open, with M3’s main entrance being accessible through BMH Green, and GSC’s through the corner of Ring Road.

On Wednesday, May 13, there is a scheduled rain day.

More information about the closure can be found here.

Share this story

More

  • News

    Waterloo student charged in U.S. after airport photography linked to suspected espionage

    Radha Vyas

    | September 4, 2026

  • Arts & Life

    Affordable weekend adventures

    Carla Stocco

    | August 28, 2026

  • Sports & Health

    A look inside the Warriors 2026-27 football season

    Shawn Kouadio

    | August 28, 2026

  • Arts & Life, News

    OVO announces collaboration with UW

    Zoey Pearce

    | August 27, 2026