Funeral held for MC-DC (and MC-M3) bridge
| March 20, 2025

A table with notebooks, pens, dried flowers, and fairy lights; above it are black-and-white and color photos of the MC-M3 bridge, a cartoon image labeled “MCAC,” and a handwritten sign with “1997-2004.”.
A table with notebooks, pens, dried flowers, and fairy lights; above it are black-and-white and color photos of the MC-M3 bridge, a cartoon image labeled “MCAC,” and a handwritten sign with “1997-2004.”.
A symbolic “funeral” was held today, March 20, for the MC-DC (and MC-M3) bridge. The bridge was closed on Oct. 25, 2024 and later demolished as part of the construction of the new Math 4 building. The opening date is expected to be late 2026 or early 2027.
“I have known this bridge for almost a tenth of a decade. It was the best bridge connecting MC and DC in the whole world,” commented one Reddit user, u/Wonderful-Leave-6470. “The bereavement will leave a temporary scar in my heart. That bridge was like a son to me.”
Many students used the bridge to avoid going outdoors on cold winter days.


Share this story
More
Arts & Life
We asked Imprint staff if they managed to stick to their New Year’s resolutions
Carla Stocco
| January 21, 2026
Sports & Health
Athletes of the week (Jan. 12): Ben Lemon and Isaiah McRae
Shawn Kouadio
| January 19, 2026
Local News
Police seek suspect connected to eight vehicle thefts in Waterloo
Imprint Staff
| January 19, 2026



